Put the crown Guide Pin onto the implant placing position using tweezers.
Combine an appropriate stopper for the implant depth with the Initial Drill Ø1.6 or Ø2.0.
Turn and lock the crown guide appropriate for the size of the determined crown guide pin to the stopper.
Carry out the initial drilling after connecting the drill, stopper and guide to the implanting position.[1000~1200RPM]
Carry out the sequence in 1~4 for the continuous implant, put the crown guide pin in line with the crown size onto the gum, and carry out the drilling as the way in the beginning
Additional Information
Initial Drill
Ø1.6 , Ø2.0 (total 2 EA), Stopper can be installed. Used for the Initial drilling.
Stopper
6mm, 8mm, 10mm, 11.5mm (total 4 EA) It plays a role of an Initial Drill Stopper where the Crown Guide is connected.
Crown guide
Ø6, Ø7, Ø8, Ø9, Ø10.5, Ø12 (total 6 EA) It provides guide to the centering and directing with intervals at the same time appropriately for the crown size (implanted prosthesis) during the drilling.
Crown Guide Pin
It is used for deciding the crown size at the implant placing position before the initial drilling. It guides the implant interval while playing a role of implant drill guide when drilling is carried out after the first drilling is placed during the implant placing.